000 01196nam a22003377a 4500
001 GENERAL-004519
003 EC-OLADE-CDD
005 20160922142743.0
008 160705b xxu||||| |||| 00| 0 spa d
040 _aOLADE-CDD
_cOLADE-CDD
041 _aeng
082 _aMTI
_b91
100 _aAvila, MarĂ­a Eugenia
700 _aCarrasco, Marco
700 _aElenko, Vince
700 _aEscobar, Flor
700 _aHurtado, Omar
245 _aPrefeasibility study for a 20 MW wind farm in Azuay, Ecuador
260 _aQuito
_bOLADE
_bUniversidad de Calgary
_c2005
300 _a86 p.
_bgrafs., tbls.
500 _aFotocopia impresa
520 _aThis report assesses the technical, economic, social, and legal aspect of implementing a 20 MW wind farm in Huascachaca and Yulug in Azuay province, Ecuador. The urrent electricity market in Ecuador is dominated by hydro and thermal generation. The CONELEC (2003) legislation guarantees a price for wind farm as they exceed.
650 _aPARQUE EOLICA
650 _aGENERACION HIDRAULICA
650 _aGENERACION TERMICA
650 _aCONELEC
650 _aAZUAY
650 _aECUADOR
651 _aECU
942 _2ddc
_cBK
999 _c9422
_d9422