000 | 00919nam a22002417a 4500 | ||
---|---|---|---|
999 |
_c7595 _d7595 |
||
001 | GENERAL-002692 | ||
003 | EC-OLADE-CDD | ||
005 | 20161114144524.0 | ||
008 | 160705b xxu||||| |||| 00| 0 spa d | ||
040 |
_aOLADE-CDD _cOLADE-CDD |
||
041 | _aeng | ||
082 |
_a333.914 _bT912 |
||
110 | _aTudor Engineering Company | ||
245 | _aA methodology for regional assessment of small scale hydropower | ||
260 |
_aWashington: _bThe World Bank, _c1984 |
||
300 |
_a109 p. _bcuadros. |
||
504 | _a01953 | ||
505 | _aThis methodolofy was presented for the regional assessment of small scale hydroelectric potential which covers new site where no developments exist and existing sites such as small dams and canal drops which can be retrofitted with hydro generation equipment. | ||
650 | _aMicrocentrales Hidroeléctricas | ||
650 | _aProyectos de Desarrollo | ||
650 | _aMetodologĂa | ||
942 |
_2ddc _cBK |