000 | 01051nam a22002417a 4500 | ||
---|---|---|---|
999 |
_c5318 _d5318 |
||
001 | GENERAL-000415 | ||
003 | EC-OLADE-CDD | ||
005 | 20161028100407.0 | ||
008 | 160705b xxu||||| |||| 00| 0 spa d | ||
040 |
_aOLADE-CDD _cOLADE-CDD |
||
041 | _aeng | ||
082 |
_a333.793 _bF2931 / v.3 |
||
110 | _aFederal Power Commission | ||
245 | _aPrevention of power failures: studies of the Task Groups on the northeast power interruption | ||
260 |
_aWashington: _bFederal Power Commission, _c1967 |
||
300 |
_a142 p. _bilustraciones., cuadros. |
||
500 | _aImpreso | ||
504 | _a06690 | ||
505 | _aComments on task force and study group reports. Studies related to northeast power interruption reflecting november 1965 and june 1966 conditions. Effect of possible but improbable events on the northeast interconnected power systems under 1968 conditions. Easter New York - New England power system behavior during november 9, 1965, interruption... | ||
650 | _aEnergía Eléctrica | ||
650 | _aSistemas de Energía | ||
942 |
_2ddc _cBK |