000 02134nam a2200277 4500
003 OSt
008 210826b ||||| |||| 00| 0 eng d
040 _aOLADE-CDD
041 _aeng
082 _a333.793
_bT337c
100 _aTeske, Sven
245 _aCitizen power for grids.
_bCase studies on collaborative infrastructure planning processes for the energy transition.
260 _a[Lugar de publicación no identificado]:
_bPAC,
_c2021
300 _a29 páginas.
_btablas.
336 _atexto
337 _acomputadora
338 _arecurso en línea
520 _aThis analysis focuses on the planning process for long-distance and high-voltage transmission lines and not for low-voltage distribution grids. It seeks to shed light on the organisation of grid planning processes and civil society engagement in five countries. The case studies provided do not claim to present a comprehensive overview, but offer some diverse examples from which lessons can be drawn. The European TYNDP is the oldest and most established process. The Australian ISP, although relatively new, translates the regional model of the TYNDP to the national level. The example from Vietnam is state-driven but includes as a recommendation a variety of scenarios that have been developed from civil society and academia (but not as part of the planning commission). Japan’s grid development process can be considered a mix of the Australian and Vietnamese examples, in which a committee is consulted on the scenario and on grid planning. Civil society is not directly involved but is indirectly consulted by two of the three sub-committees via specific submissions. In Chile, civil society is not involved in the scenario development, but provides inputs to the spatial planning process.
650 _aSistemas de Energía Eléctrica
650 _aPlanificación Energética
650 _aSociedad Civil
700 _aGibb, Duncan
856 _uhttp://biblioteca.olade.org/opac-tmpl/Documentos/cg01038.pdf
856 _uhttps://www.ren21.net/wp-content/uploads/2021/01/PAC_Citizen-Power-for-Grids_FINAL_WEB.pdf
942 _2ddc
_cDOCD
999 _c14971
_d14971