000 01402nam a22002657a 4500
999 _c12635
_d12635
001 GENERAL-007732
003 EC-OLADE-CDD
005 20161027144602.0
008 160705b xxu||||| |||| 00| 0 spa d
040 _aOLADE-CDD
_cOLADE-CDD
041 _aeng
082 _a333.793
_bI125i
110 _aIBERDROLA
245 _aInterconexión eléctrica de América Latina y el Caribe: proyectos de interconexión
260 _aMadrid:
_bTHERMIE,
_c1997
300 _a324 p.
_bcuadros.
504 _a01066
505 _aProspective analysis of the step by step development of the interconnections between the electrical systems of Columbia, Mexico, Venezuela and the Central American countries. Technical limits of interconnected systems. Stability enhancement in longitudinally interconnected power systems in Japan. Application of power system stabilizers on the brazilian interconnected power system. Development of interconnection of utilities in south - east Australia. Joint operation and other cooperation principles of grid owners in Finland. Limits of interconnection - criteria for and examples of a reasonable extension. Regional interconnections in the brazilian power system : problems and planning criteria.
650 _aEnergía Eléctrica
650 _aEnergía
650 _aSistemas de Energía
650 _aEstadística
651 _aAmérica Latina
942 _2ddc
_cBK