245 _aProjected costs of generating electricity: from power stations for commisioning in the period 1995 - 2000
260 _aParis:
_bOECD,
_c1989
300 _a206 p.
_bcuadros.
504 _a04244
505 _aThis study reviews the projected electricity generation costs for the base load power generation options expected to be available in the medium term, using an agreed common economic methodology. Cost projections were obtained for nuclear and fossil fuelled plants that could in principle be commisioned in the mid- 1990s, or shortly thereafter, although not all countries plan to commission plants at that time.