000 | 01175nam a22002537a 4500 | ||
---|---|---|---|
999 |
_c10381 _d10381 |
||
001 | GENERAL-005478 | ||
003 | EC-OLADE-CDD | ||
005 | 20161031134347.0 | ||
008 | 160705b xxu||||| |||| 00| 0 spa d | ||
022 | _a92-64-13316-X | ||
040 |
_aOLADE-CDD _cOLADE-CDD |
||
041 | _aeng | ||
082 |
_a333.793 _bO281p |
||
110 | _aOrganisation for Economic Co-operation and Development | ||
245 | _aProjected costs of generating electricity: from power stations for commisioning in the period 1995 - 2000 | ||
260 |
_aParis: _bOECD, _c1989 |
||
300 |
_a206 p. _bcuadros. |
||
504 | _a04244 | ||
505 | _aThis study reviews the projected electricity generation costs for the base load power generation options expected to be available in the medium term, using an agreed common economic methodology. Cost projections were obtained for nuclear and fossil fuelled plants that could in principle be commisioned in the mid- 1990s, or shortly thereafter, although not all countries plan to commission plants at that time. | ||
650 | _aProducción de Energía - Aspectos Económicos | ||
650 | _aEnergía Eléctrica | ||
650 | _aEnergía Nuclear | ||
942 |
_2ddc _cBK |