Tipo de ítem | Ubicación actual | Colección | Signatura | Estado | Fecha de vencimiento | Código de barras |
---|---|---|---|---|---|---|
Libros | Centro de Documentación - Olade | Documentos Externos | 333.823/H139 (Navegar estantería) | Disponible | 005006 |
04083
This study discusses transport cost factors, and to evaluate the conditions favoring either electricity generation close to the gas field with subsequent electricity transmission via high voltage power lines to the consumer load centers, or transport of natural gas by pipeline to power plants located close to the load centers.
No hay comentarios en este titulo.